Machinery Declaration of Conformity generator
Official Journal texts last checked for changes:
Annex V of the Machinery Regulation has two parts, which are different instruments rather than two formats of one document. Part A is the EU declaration of conformity for machinery and related products. Part B is the declaration of incorporation for partly completed machinery, and it contains a statement that Part A does not: that the partly completed machinery shall not be put into service until the final machinery into which it is to be incorporated has itself been declared in conformity. This free tool generates either document, verbatim in your language. Directive 2006/42/EC is repealed with effect from 20 January 2027, but Article 52(1) protects products placed on the market under it before that date.
This tool reproduces what the act prescribes. It does not assess your product, and it does not decide which obligations apply to you or whether a document satisfies them.
One free document per tool · Runs in your browser · Nothing uploaded
Before you rely on this document
- Check it against the act. The tool assembles the model wording set out in the legislation. It does not check that your entries are true, complete or correct for your product, so read the document against the act itself before you sign it.
- This is one required document, not your compliance. The risk assessment, the technical documentation you must keep and be able to produce on request, the EU-based responsible person where the act requires one, any registration, and the marking and labelling on the product itself all remain yours. Generating a declaration discharges none of them.
- Where an assessment or a notified body is required, it must actually have happened. A declaration stating that it did is a statement you make. RulesOf.EU cannot and does not verify it.
- Keep your own copy, with the evidence behind it. The document is generated in your browser and RulesOf.EU keeps nothing, so if you do not save it, nobody holds a copy.
- Have anything high-stakes reviewed by a qualified adviser. A first placing on the market, a submission to customs or an authority, a recall or a customer audit each justifies a qualified adviser’s time. This tool is a drafting aid.