PPE Declaration of Conformity generator
Personal protective equipment must be covered by an EU declaration of conformity before the CE marking goes on, and the declaration accompanies the equipment or is reachable at an internet address supplied with it. Article 15 requires it and Annex IX sets out its model structure. This free generator follows those nine points in the words the Regulation uses — nine, not eight, because PPE splits the notified body across two of them. What changed since: Regulation (EU) 2024/2748 has applied since 29 May 2026, adding emergency conformity-assessment procedures — it leaves Annex IX untouched.
5 FREE DOCUMENTS · RUNS IN YOUR BROWSER · NOTHING UPLOADED
Batch import from CSV
One document per row, for a whole catalogue. The file is read in your browser and never uploaded — the same as everything else on this page.
| Column | This form's field |
|---|
Nothing here is checked against the act. This does not validate your entries, it does not decide which tool applies to your product, and a bad row produces a bad document. It does not check that the conformity assessment behind each declaration was carried out — that is the same responsibility the single form carries, two hundred times over.