Directive 2014/30/EU · Annex IV ·Applies since 20 April 2016

EMC Declaration of Conformity generator

Equipment liable to generate electromagnetic disturbance, or whose own performance is liable to be affected by it, must be covered by an EU declaration of conformity before the CE marking goes on. Article 15 requires it and Annex IV sets out its model structure. This free generator follows those eight points in the words the Directive uses. There is no countdown on this page and no future date to watch: the obligation has applied since 20 April 2016, and the two amendments since then leave the declaration model untouched.

5 FREE DOCUMENTS · RUNS IN YOUR BROWSER · NOTHING UPLOADED

Equipment

Manufacturer

Authorised representative (optional)

Conformity

Notified body (optional)

Signature

Runs entirely in your browser — nothing you enter is uploaded or stored on a server while you generate.

The declaration attests to an assessment you have already made. The essential requirements in Annex I, the conformity assessment in Annex II or III, and the technical documentation are separate obligations and this tool does not check any of them. Point 5 leaves the Union harmonisation legislation open, so one declaration can cover the Low Voltage Directive and others alongside this one. It does not tell you which act applies to your product. Informational only, not legal advice.
LIVE PREVIEW · EU DECLARATION OF CONFORMITY
Batch import from CSV

One document per row, for a whole catalogue. The file is read in your browser and never uploaded — the same as everything else on this page.

Column This form's field

Nothing here is checked against the act. This does not validate your entries, it does not decide which tool applies to your product, and a bad row produces a bad document. It does not check that the conformity assessment behind each declaration was carried out — that is the same responsibility the single form carries, two hundred times over.