EMC Declaration of Conformity generator
Equipment liable to generate electromagnetic disturbance, or whose own performance is liable to be affected by it, must be covered by an EU declaration of conformity before the CE marking goes on. Article 15 requires it and Annex IV sets out its model structure. This free generator follows those eight points in the words the Directive uses. There is no countdown on this page and no future date to watch: the obligation has applied since 20 April 2016, and the two amendments since then leave the declaration model untouched.
5 FREE DOCUMENTS · RUNS IN YOUR BROWSER · NOTHING UPLOADED
Batch import from CSV
One document per row, for a whole catalogue. The file is read in your browser and never uploaded — the same as everything else on this page.
| Column | This form's field |
|---|
Nothing here is checked against the act. This does not validate your entries, it does not decide which tool applies to your product, and a bad row produces a bad document. It does not check that the conformity assessment behind each declaration was carried out — that is the same responsibility the single form carries, two hundred times over.